Close
Contact Us
Help
Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Add to lightbox
Add to cart
Get URL
Keywords
Climate (campaign title)
Day
Eye contact
Forests (topography)
KWCI (GPI)
Local population
Measuring tools
Men
One person
Outdoors
Trees
Dean Wilson at Atchafalaya Basin Pipeline Construction Area
Atchafalaya Basinkeeper, Dean Wilson standing in front of an old growth cypress tree that will be pulverized by the Bayou Bridge Pipeline LLC. The tree is on the 75 foot wide pipeline right-of-way the company will clear before installing the pipeline. Some of the pipeline right-of-way is cleared already, but some of it can not be done until the water in the basin goes down.
Containers
Shoot:
Bayou Bridge Pipeline Construction in Louisiana
Construction continues on the Bayou Bridge Pipeline in Acadia Parish in Louisiana. The Bayou Bridge Pipeline (BBP), is a crude oil pipeline project through Louisiana's Atchafalaya Basin and across 11 parishes. It is to connect an oil-and-gas hub in Texas with oil refineries in Louisiana. The planned 162 miles of pipeline have been estimated to cost $670 million.
Conceptually similar
Unique identifier:
GP0STS47K
Type:
Image
Shoot date:
31/05/2018
Locations:
Louisiana
,
North America
,
United States of America
Credit line:
© Julie Dermansky / Greenpeace
Size:
4000px × 2658px 6.41 MB
Latitude:
30°5'19.02"N
Longitude:
91°22'13.56"W
Ranking:
★★★★ (E)