Close
Contact Us
Help
Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Add to lightbox
Add to cart
Get URL
Keywords
Climate (campaign title)
Coal-fired power stations
Indoors
KWCI (GPI)
People
Press conferences
Speeches
Muak Lek Power Plant Opposition Press Conference in Bangkok
Muak Lek Conservation club, Center of Peace and Conflict Studies, EnLaw and Greenpeace Southeast Asia organise a press conference to show their concerns on the failure of the Environmental and Health Impact Assessment (EHIA) regarding the Muak Lek coal power plant project.
The group states that the EHIA of the 150-megawatt coal fired power plant project is not comprehensive and properly conducted. This may cause inevitable impacts on environment and people’s health.
In original language:
งานแถลงข่าวในกรุงเทพ
ชมรมอนุรักษ์มวกเหล็ก ศูนย์ศึกษาสันติภาพและความขัดแย้ง มูลนิธินิติธรรมสิ่งแวดล้อม และกรีนพีซ เอเชียตะวันออกเฉียงใต้ จัดงานเสวนา “EHIA พลังงานมวกเหล็ก ต้นทุนที่ต้องจ่าย?” ที่ อาคารเฉลิมราชกุมารี 60 พรรษา จุฬาลงกรณ์มหาวิทยาลัย
การประเมินผลกระทบทางสิ่งแวดล้อมและสุขภาพ(EHIA) ของโครงการโรงไฟฟ้าถ่านหินมวกเหล็กที่ไม่ครอบคลุมและก่อให้เกิดความไม่ชอบธรรมในกระบวนการซึ่งอาจจะส่งผลต่อภาระต้นทุนทางเศรษฐกิจสิ่งแวดล้อมและสุขภาพต่อประชาชนในพื้นที่อย่างหลีกเลี่ยงไม่ได้
Containers
Shoot:
Muak Lek Power Plant Opposition Press Conference in Bangkok
Press conference organized by Muak Lek Conservation club, Center of Peace and Conflict Studies, EnLaw and Greenpeace Southeast Asia opposing a 150-megawatt power plant project in the Muak Lek province, Thailand.
Conceptually similar
Unique identifier:
GP0STT0F6
Type:
Image
Shoot date:
27/11/2018
Locations:
Bangkok
,
Southeast Asia
,
Thailand
Credit line:
© Tadchakorn Kitchaiphon / Greenpeace
Size:
5472px × 3648px 8.47 MB
Ranking:
★★★★ (E)