Close
Contact Us
Help
Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Add to lightbox
Add to cart
Get URL
Keywords
Climate (campaign title)
Clouds
Copy space
Energy [R]evolution (campaign title)
Evening
KWCI (GPI)
Outdoors
Pink
Silhouettes
Summer
Sunsets
Wind energy
Wind farms
Wind turbines
Wind Energy Farm in Colorado
Turbines spin in the 300MW Cedar Creek Wind Energy Project. With 274 turbines, Cedar Creek is located in a 13,000ha (32,000-acre) site about 13km (8 miles) east of Grover in north-central Weld County, Colorado. It is one of the largest single wind-power facilities in the United States
Cedar Creek will help Colorado achieve its goal of 20% renewable energy by 2020. Cedar Creek Wind Energy LLC owns the plant, which is a joint venture between Babcock & Brown (67%) and BP Alternative Energy (33%). The capital investment was more than $480m.
Containers
Shoot:
Wind Energy Farms in Colorado
Wind energy is part of the growth of renewable energy in Colorado which became the first U.S. state to create a renewable portfolio standard (RPS) by ballot initiative when voters approved Amendment 37 in November 2004. The original version of Colorado's RPS required utilities serving 40,000 or more customers to generate or purchase enough renewable energy to supply 10% of their retail electric sales. In March 2007, HB 1281 increased the RPS and extended a separate renewable-energy requirement to electric cooperatives, among other changes. HB 1001 of 2010 further expanded the RPS. Eligible renewable-energy resources include solar-electric energy, wind energy, geothermal-electric energy, biomass facilities that burn nontoxic plants, landfill gas, animal waste, hydropower, recycled energy, and fuel cells using hydrogen derived from eligible renewables. The PUC has issued rules to implement the RPS. The rules were amended as required by HB 1001 in August 2010. The PUC's rules generally apply to investor-owned utilities (IOUs). Electric cooperatives and municipal utilities serving more than 40,000 customers are still bound to the separate requirement approved by the legislature.
Conceptually similar
Unique identifier:
GP04NNK
Type:
Image
Shoot date:
31/05/2013
Locations:
Colorado
,
North America
,
United States of America
Credit line:
© Greenpeace / Robert Meyers
Size:
6022px × 4014px 13.40 MB
Ranking:
★★★★ (E)