Close
Contact Us
Help
Login
Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Your browser does not support this video.
Copy video URL
Copy video URL at current time
https://media.greenpeace.org/asset-management/27MZIF27ECW5
Add to lightbox
Add to cart
Get link
Keywords
Construction
Construction equipment
Construction sites
Day
Hard hats
Industrial cranes
KWCI (GPI)
Manual workers
MY Rainbow Warrior III
Outdoors
Shipyards
Wharfs (Docks)
Rainbow Warrior III Mast Installation - International Version
A revolutionary mast system is raised on the new Greenpeace flagship, Rainbow Warrior III at the Fassmer shipyard in Berne, near Bremen. The highly efficient 55m high A-Frame mast system, created by the famous Dutch naval architecture firm Dijkstra and Partners, can carry far more sail than a conventional mast of the same size and is the first time this design has been installed on a vessel of the Rainbow Warrior?s size. The Rainbow Warrior is Greenpeace's first purpose-built vessel and will be officially launched in Autumn 2011. Includes soundbites from Wiilliam Sykes, Project Manager, Construction of Rainbow Warrior III and Uwe Lampe, Head of Design Department, Fassmer shipyard and Oscar Soria, Greenpeace International.
Unique identifier:
GP03DJT
Type:
Video
Shoot date:
08/07/2011
Locations:
Berne (Germany)
,
Europe
,
Germany
Credit line:
© Greenpeace
Duration:
11m34s
Audio format:
Natural
Ranking:
★★★★ (E)
Containers
Shoot:
Rainbow Warrior III Construction
Construction progress of the new Greenpeace ship Rainbow Warrior III at the Maritim Shipyard in Gdansk, Poland and at the Fassmer Shipyard in Berne, Germany.
Related Collections:
Rainbow Warrior III Construction (Photos & Videos)
Conceptually similar