Close
Contact us
Help
Register
Login
Search
Advanced search
Rainbow Warrior III Construction
GP027S0
Completed
★★★★
Deselect all
Deselect all
Select all
Invert Selection
Download
1 item
Go to Login page
Linked assets
Package
Rainbow Warrior III Construction (Photos & Videos)
GP0ALB17
GP0ALB17
★★★★
Folder
Rainbow Warrior III Construction
GP027SC
GP027SC
★★★★
View all
Rainbow Warrior III Construction
Works on the new Greenpeace ship Rainbow Warrior III at Maritim Shipyard. The hull is composed of seven sections, which were prepared individually in the shipbuilding hall. All components are built upside down and must be turned before being moved to the hull. Turning of the bow section in front of the hull.
Creator:
Oliver Tjaden
Unique identifier:
GP027S0
Old Image ID:
_DSC7954
Type:
Image
Ranking:
★★★★
Size:
3161px × 2244px 2MB
Keywords
Keywords:
Construction
-
Construction sites
-
Day
-
Helmets
-
KWCI (GPI)
-
Manual workers
-
MY Rainbow Warrior III
-
Outdoors
-
Shipyards
-
Small group of people