Close
Contact us
Help
Register
Login
Search
Advanced search
Atchafalaya Basin Pipeline Construction
GP0STS47P
Completed
★★★★
Deselect all
Deselect all
Select all
Invert Selection
Download
1 item
Go to Login page
Linked assets
Folder
Bayou Bridge Pipeline Construction in Louisiana
GP0STRQC0
GP0STRQC0
★★★★
Atchafalaya Basin Pipeline Construction
Detail of a measuring tool showing a cleared area along the Bayou Bridge Pipelines right-of-way in the Atchafalaya Basin, in Southern Louisiana that measures 89.1 ft.
The permit allows a 75 foot wide pipeline right-of-way to be cleared for pipeline construction. The Atchafalaya Basinkeeper measured the pipeline right-of-way in three areas that have been cleared in the basin on land owned by the state and found the company cleared more than 80ft in all three areas. One measurement showed the company cleared 89.1 ft of land.
Creator:
Julie Dermansky
Unique identifier:
GP0STS47P
Old Image ID:
8.18.16.PipelineBayouBridge.602A0062
Type:
Image
Ranking:
★★★★
Size:
4000px × 2667px 3MB
Keywords
Keywords:
Climate (campaign title)
-
Close ups
-
Day
-
KWCI (GPI)
-
Measuring tools
-
Outdoors